To ensure the quality of concrete stirring, concrete batch plants should be required Stir concrete mix, mixing time is short, fast unloading, the residual is less, low power consumption and less pollution.Stabilized Soil Mixing Plant The main factors affecting the quality of the concrete mixer stir: formal structure mixer, blender and mix feed tube geometry volume capacity ratio of the feed mixture and concrete batch plants feeding program position, mixing geometry configuration and arrangement of leaves, stirring speed and blade liner wear conditions.
1, should be empty before stirring commissioning.
2, according to the mixing time to adjust the time relay timer, to adjust in case of power failure.
3, the mixing tube and the water wet leaves and venue.
4, processes such as electrical or mechanical failure should occur unloading part of the mixing materials, reduce the load,cement concrete mixer troubleshooting and then drive operation.
5, when operating, should be inspected regularly to prevent electric shock and mechanical wounding accidents.
6, the test is completed, turn off the power, clean the mixing tube and venues cleaning.
Scale mixing station modest scale mixing station, mixing station with a total installed capacity to meet the needs of large quantities of concrete principles.
2014年7月17日星期四
2014年7月10日星期四
Concrete mixing station equipment management
1 Electromechanical before a person should be responsible for opening day to the guidance, inspection, supervision, and the device drivers "Cross operations."
Stabilized Soil Mixing Plant2 In case of continuous casting watering requirements when a large volume of concrete components. Pay particular attention to equipment belt correction, cleaning metering pressure sensor.
(1) for failure-prone parts to maintain focus and ensure there is an appropriate accessory reserves;To be specific precast concrete plant process control equipment, emergency equipment to develop appropriate measures
(2) contact with the electricity sector, asking them to provide reliable power to ensure that;
(3) maintain a standby generator in good technical condition;
(4) maintenance of good, ready to foot concrete transport vehicles (To do a slight surplus). Only when the device is ready before being submitted to the device is ready to dispatch information.
3 mixing station should be equipped with two hydraulic pipes, so when the concrete truck for failure to use other power concrete tank unloading. Appropriate alternate picks, promptly remove solidified concrete mixer truck concrete tank. Equipment maintenance, adjustment, when maintenance, cleanup, you must cut off the main power switch, and hung "Overhaul, DO NOT TURN ON" warning signs.
4 concrete mixing station electronic control equipment, high technology content, should be equipped with an experienced electrician, responsible for the daily maintenance of electrical equipment.
Stabilized Soil Mixing Plant2 In case of continuous casting watering requirements when a large volume of concrete components. Pay particular attention to equipment belt correction, cleaning metering pressure sensor.
(1) for failure-prone parts to maintain focus and ensure there is an appropriate accessory reserves;To be specific precast concrete plant process control equipment, emergency equipment to develop appropriate measures
(2) contact with the electricity sector, asking them to provide reliable power to ensure that;
(3) maintain a standby generator in good technical condition;
(4) maintenance of good, ready to foot concrete transport vehicles (To do a slight surplus). Only when the device is ready before being submitted to the device is ready to dispatch information.
3 mixing station should be equipped with two hydraulic pipes, so when the concrete truck for failure to use other power concrete tank unloading. Appropriate alternate picks, promptly remove solidified concrete mixer truck concrete tank. Equipment maintenance, adjustment, when maintenance, cleanup, you must cut off the main power switch, and hung "Overhaul, DO NOT TURN ON" warning signs.
4 concrete mixing station electronic control equipment, high technology content, should be equipped with an experienced electrician, responsible for the daily maintenance of electrical equipment.
Maintenance of concrete mixing tank drives
concrete mixing tank Role is to drive concrete tank driver rotation, which consists of power take off,Stabilized Soil Mixing Plant cardan shaft, hydraulic pumps, hydraulic motors, control valves, hydraulic tank and the cooling device components. If this section due to failure to stop working,concrete tank will not rotate, which causes the car scrap concrete, serious and even the entire concrete tank condensation in the tank, causing the concrete mixer truck scrapped. Therefore, whether the drive is in use must be highly reliable and important issue. To ensure reliable drive intact, should do the following maintenance work:
a. universal rotating part is failure-prone area, should be when lubrication and wear of regular checks and timely repair replacement. The team should spare cardan shaft assembly to ensure that the event of failure to resume work in a few minutes.
b. ensure the hydraulic oil clean. Concrete mixing truck harsh working environment, we must prevent sewage sediment into the hydraulic system. Hydraulic oil according to the user manual require periodic replacement. Once the inspection found that the hydraulic oil mixed with water or sand, we should immediately stop cleaning hydraulic systems, replacement of hydraulic oil.
c. ensure effective hydraulic oil cooling device.batch mixing plant To regularly clean hydraulic oil cooler, avoiding clogged radiator cement, check the radiator electric fan is functioning properly, prevent hydraulic oil temperature exceeded. Hydraulic part as long as the hydraulic oil clean, the general failure much; But different manufacturers, life is not the same.
a. universal rotating part is failure-prone area, should be when lubrication and wear of regular checks and timely repair replacement. The team should spare cardan shaft assembly to ensure that the event of failure to resume work in a few minutes.
b. ensure the hydraulic oil clean. Concrete mixing truck harsh working environment, we must prevent sewage sediment into the hydraulic system. Hydraulic oil according to the user manual require periodic replacement. Once the inspection found that the hydraulic oil mixed with water or sand, we should immediately stop cleaning hydraulic systems, replacement of hydraulic oil.
c. ensure effective hydraulic oil cooling device.batch mixing plant To regularly clean hydraulic oil cooler, avoiding clogged radiator cement, check the radiator electric fan is functioning properly, prevent hydraulic oil temperature exceeded. Hydraulic part as long as the hydraulic oil clean, the general failure much; But different manufacturers, life is not the same.